Saving energy - Saving the future! We simply make our electricity ourselves!
- Ever since 2015, we have been operating a large-area 600 kWp photovoltaic power plant for internal consumption on the roofs of our workshops.
- This was followed in 2017 by certification according to DIN ISO 50001 and integration of the relevant guidelines into our daily work and process thinking.
- When our administration building was built, recovery of exhaust heat from production for use as useful heat for heating and hot water started. Since then, our gas connection has been obsolete!